AI Math SolverPricing
Login

Virar Panvel Corridor Route Map High Quality

Unlike the traditional lines that go through Churchgate or CSMT, the Virar–Panvel line acts as an . It runs parallel to the Western line initially, then cuts east across the northern fringes of the city before descending south towards the Navi Mumbai region.

The corridor is part of the and aims to create a dedicated double-line suburban track parallel to the existing Vasai-Roha line. Total Length: 69.5 km. No. of Stations: 13 key stops. Districts Covered: Palghar, Thane, and Raigad. virar panvel corridor route map

The route map can be visualized through these critical nodes from West to East: Unlike the traditional lines that go through Churchgate

The is a transformative 70-km railway project designed to provide a direct east-west link in the Mumbai Metropolitan Region (MMR) . By connecting the Western, Central, and Harbour lines, this corridor will bypass the heavily congested South Mumbai hubs, significantly reducing travel time for millions of daily commuters. Virar-Panvel Corridor: Key Route Details Total Length: 69

The proposed corridor would stretch for 65 kilometers, connecting the town of Virar in the north to Panvel in the south, passing through the heart of the Mumbai Metropolitan Region (MMR). The project aimed to reduce travel time, decrease congestion, and provide a much-needed boost to the region's economy.

The route runs roughly parallel to the creek and the proposed alignment of major infrastructure projects like the Vadhavan Port connectivity.